Monday, June 27, 2016

2nd Floor & Concrete Prep

It seems with this heat, everyone wants basement work!  We had Tom's advance crew prepping the basement slab, and when I got there, even Miguel had moved down from his second floor floor progress and was "checking on something" in the basement.  Who can blame him though, temperatures outside, with humidity and reflective plywood were well over 40 degrees!



No comments:

Post a Comment