Friday, September 30, 2016

Insulation Inspection

The City inspector was in this afternoon, which made the work of installing the vapour barrier, batt insulation around pot lights and skylights, and caulking all of the wood to wood joints a little time sensitive this morning.  By afternoon, the inspector arrived and all was good.  We have the go to start drywall!


No comments:

Post a Comment